27 Regulations & Approvals questions from the Site & Project Mgmt bank, written for Indian campus drives and tech interviews. Every question has a verified answer and an AI-tutor explanation on placd.
Free to start: the 2-minute CE readiness check — six questions and a result.
A.independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
B.minimum open distance between a building and its plot boundary on each side, increasing with building height and abutting road width under bye-laws
C.issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
D.National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
Answer + AI explanation with Pro
2. Which term means: "National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws"?
Junior
A.Height clearances
B.Occupancy certificate
C.Floor space index
D.NBC 2016
Answer + AI explanation with Pro
3. Which statement is correct?
Junior
A.NBC 2016 — AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
B.NBC 2016 — registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
C.NBC 2016 — independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
D.NBC 2016 — National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
Answer + AI explanation with Pro
4. What is Floor space index?
Junior
A.registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
B.ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
C.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
D.National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
Answer + AI explanation with Pro
5. Which term means: "ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights"?
Junior
A.Floor space index
B.RERA 2016
C.NBC 2016
D.Structural proof check
Answer + AI explanation with Pro
6. Which statement is correct?
Junior
A.Floor space index — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
B.Floor space index — AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
C.Floor space index — provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.Floor space index — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
Answer + AI explanation with Pro
7. What is Setback?
Junior
A.EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
B.National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
C.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
D.minimum open distance between a building and its plot boundary on each side, increasing with building height and abutting road width under bye-laws
Answer + AI explanation with Pro
8. Which term means: "minimum open distance between a building and its plot boundary on each side, increasing with building height and abutting road width under bye-laws"?
Junior
A.Height clearances
B.Setback
C.Occupancy certificate
D.Fire NOC
Answer + AI explanation with Pro
9. Which statement is correct?
Junior
A.Setback — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
B.Setback — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
C.Setback — minimum open distance between a building and its plot boundary on each side, increasing with building height and abutting road width under bye-laws
D.Setback — registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
Answer + AI explanation with Pro
10. What is RERA 2016?
Mid
A.issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
B.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
C.independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
D.registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
Answer + AI explanation with Pro
11. Which term means: "registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability"?
Mid
A.RERA 2016
B.Setback
C.Fire NOC
D.Height clearances
Answer + AI explanation with Pro
12. Which statement is correct?
Mid
A.RERA 2016 — minimum open distance between a building and its plot boundary on each side, increasing with building height and abutting road width under bye-laws
B.RERA 2016 — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
C.RERA 2016 — EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
D.RERA 2016 — registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
Answer + AI explanation with Pro
13. What is Fire NOC?
Mid
A.ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
B.EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
C.provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
Answer + AI explanation with Pro
14. Which term means: "provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions"?
Mid
A.Height clearances
B.Structural proof check
C.Fire NOC
D.NBC 2016
Answer + AI explanation with Pro
15. Which statement is correct?
Mid
A.Fire NOC — AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
B.Fire NOC — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
C.Fire NOC — provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.Fire NOC — EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
Answer + AI explanation with Pro
16. What is Environmental clearance?
Senior
A.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
B.EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
C.provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
Answer + AI explanation with Pro
17. Which term means: "EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre"?
Senior
A.Environmental clearance
B.Fire NOC
C.Floor space index
D.Height clearances
Answer + AI explanation with Pro
18. Which statement is correct?
Senior
A.Environmental clearance — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
B.Environmental clearance — registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
C.Environmental clearance — National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
D.Environmental clearance — EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
Answer + AI explanation with Pro
19. What is Occupancy certificate?
Junior
A.issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
B.National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
C.provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
Answer + AI explanation with Pro
20. Which term means: "issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities"?
Junior
A.Occupancy certificate
B.Structural proof check
C.Environmental clearance
D.Fire NOC
Answer + AI explanation with Pro
21. Which statement is correct?
Junior
A.Occupancy certificate — National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
B.Occupancy certificate — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
C.Occupancy certificate — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
D.Occupancy certificate — EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
Answer + AI explanation with Pro
22. What is Height clearances?
Senior
A.AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
B.ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
C.provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
D.EIA Notification 2006 category B for built-up area of 20,000 to 1,50,000 m² through the state authority, larger townships going to the centre
Answer + AI explanation with Pro
23. Which term means: "AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height"?
Senior
A.Height clearances
B.Environmental clearance
C.Fire NOC
D.RERA 2016
Answer + AI explanation with Pro
24. Which statement is correct?
Senior
A.Height clearances — AAI no-objection through NOCAS within 20 km of an airport, plus coastal zone and heritage restrictions that override the general bye-law height
B.Height clearances — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
C.Height clearances — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
D.Height clearances — independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
Answer + AI explanation with Pro
25. What is Structural proof check?
Senior
A.provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
B.independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
C.National Building Code in two volumes whose Part 4 covers fire and life safety, Part 6 structural design and Part 7 construction management, adopted through state bye-laws
D.registration of projects over 500 m² or 8 units, 70 percent of buyer money in escrow, sale on carpet area and 5-year structural defect liability
Answer + AI explanation with Pro
26. Which term means: "independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction"?
Senior
A.Fire NOC
B.RERA 2016
C.Environmental clearance
D.Structural proof check
Answer + AI explanation with Pro
27. Which statement is correct?
Senior
A.Structural proof check — ratio of total built-up floor area to plot area allowed by development control rules, raised through premium FSI or transferable development rights
B.Structural proof check — independent review of design by an IIT, NIT or empanelled consultant demanded by many authorities for tall or important buildings before sanction
C.Structural proof check — issued by the local authority after completion certificate on verifying compliance with the sanctioned plan and NOCs, needed for legal occupation and utilities
D.Structural proof check — provisional clearance from the state fire service at plan stage and final before occupation for buildings 15 m and taller, checking NBC Part 4 provisions
Answer + AI explanation with Pro
Free to start
Start with a free readiness check
Sign up free for the 2-minute CE readiness check and a scored result. Answers, explanations and the AI tutor on every Regulations & Approvals question come with Pro.