Lean Manufacturing interview questions

27 Lean Manufacturing questions from the Production & Plant bank, written for Indian campus drives and tech interviews. Every question has a verified answer and an AI-tutor explanation on placd.

Free to start: the 2-minute ME readiness check — six questions and a result.

Take the free ME readiness check

or take a mock interview set up for this area

1. What is 5S?

Junior
  1. A.levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  2. B.sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management
  3. C.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  4. D.automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced

Answer + AI explanation with Pro

2. Which term means: "sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management"?

Junior
  1. A.Jidoka
  2. B.Value stream mapping
  3. C.5S
  4. D.Heijunka

Answer + AI explanation with Pro

3. Which statement is correct?

Junior
  1. A.5S — levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  2. B.5S — automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced
  3. C.5S — cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones
  4. D.5S — sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management

Answer + AI explanation with Pro

4. What is Seven wastes?

Junior
  1. A.current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  2. B.levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  3. C.transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  4. D.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process

Answer + AI explanation with Pro

5. Which term means: "transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others"?

Junior
  1. A.5S
  2. B.Seven wastes
  3. C.Jidoka
  4. D.Kaizen

Answer + AI explanation with Pro

6. Which statement is correct?

Junior
  1. A.Seven wastes — levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  2. B.Seven wastes — current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  3. C.Seven wastes — sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management
  4. D.Seven wastes — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others

Answer + AI explanation with Pro

7. What is Kaizen?

Junior
  1. A.transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  2. B.cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones
  3. C.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  4. D.current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start

Answer + AI explanation with Pro

8. Which term means: "continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process"?

Junior
  1. A.Value stream mapping
  2. B.Kanban
  3. C.Heijunka
  4. D.Kaizen

Answer + AI explanation with Pro

9. Which statement is correct?

Junior
  1. A.Kaizen — current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  2. B.Kaizen — continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  3. C.Kaizen — automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced
  4. D.Kaizen — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others

Answer + AI explanation with Pro

10. What is Poka-yoke?

Junior
  1. A.automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced
  2. B.levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  3. C.mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream
  4. D.cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones

Answer + AI explanation with Pro

11. Which term means: "mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream"?

Junior
  1. A.SMED
  2. B.Poka-yoke
  3. C.Kanban
  4. D.5S

Answer + AI explanation with Pro

12. Which statement is correct?

Junior
  1. A.Poka-yoke — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  2. B.Poka-yoke — continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  3. C.Poka-yoke — mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream
  4. D.Poka-yoke — cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones

Answer + AI explanation with Pro

13. What is Kanban?

Junior
  1. A.signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it
  2. B.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  3. C.mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream
  4. D.sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management

Answer + AI explanation with Pro

14. Which term means: "signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it"?

Junior
  1. A.Jidoka
  2. B.Poka-yoke
  3. C.Kanban
  4. D.Seven wastes

Answer + AI explanation with Pro

15. Which statement is correct?

Junior
  1. A.Kanban — sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management
  2. B.Kanban — signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it
  3. C.Kanban — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  4. D.Kanban — mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream

Answer + AI explanation with Pro

16. What is Value stream mapping?

Mid
  1. A.sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management
  2. B.current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  3. C.transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  4. D.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process

Answer + AI explanation with Pro

17. Which term means: "current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start"?

Mid
  1. A.Kaizen
  2. B.Jidoka
  3. C.Poka-yoke
  4. D.Value stream mapping

Answer + AI explanation with Pro

18. Which statement is correct?

Mid
  1. A.Value stream mapping — mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream
  2. B.Value stream mapping — current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  3. C.Value stream mapping — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  4. D.Value stream mapping — cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones

Answer + AI explanation with Pro

19. What is SMED?

Junior
  1. A.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  2. B.levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  3. C.cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones
  4. D.mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream

Answer + AI explanation with Pro

20. Which term means: "cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones"?

Junior
  1. A.Kaizen
  2. B.Jidoka
  3. C.Kanban
  4. D.SMED

Answer + AI explanation with Pro

21. Which statement is correct?

Junior
  1. A.SMED — cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones
  2. B.SMED — transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  3. C.SMED — continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  4. D.SMED — signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it

Answer + AI explanation with Pro

22. What is Jidoka?

Mid
  1. A.signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it
  2. B.transport, inventory, motion, waiting, overproduction, over-processing and defects, with overproduction regarded as the worst because it hides the others
  3. C.automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced
  4. D.continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process

Answer + AI explanation with Pro

23. Which term means: "automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced"?

Mid
  1. A.Seven wastes
  2. B.Poka-yoke
  3. C.Jidoka
  4. D.Heijunka

Answer + AI explanation with Pro

24. Which statement is correct?

Mid
  1. A.Jidoka — cutting changeover to single-digit minutes by separating internal from external setup and converting internal steps to external ones
  2. B.Jidoka — automation with a human touch, where a machine or operator stops the line on an abnormality via the andon so defects are not produced
  3. C.Jidoka — current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  4. D.Jidoka — levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand

Answer + AI explanation with Pro

25. What is Heijunka?

Senior
  1. A.levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand
  2. B.signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it
  3. C.current- and future-state map of material and information flow whose process cycle efficiency (value-added time over lead time) is usually under 5% at the start
  4. D.sort, set in order, shine, standardise and sustain (seiri, seiton, seiso, seiketsu, shitsuke), the workplace discipline that underpins visual management

Answer + AI explanation with Pro

26. Which term means: "levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand"?

Senior
  1. A.Value stream mapping
  2. B.Heijunka
  3. C.SMED
  4. D.Kanban

Answer + AI explanation with Pro

27. Which statement is correct?

Senior
  1. A.Heijunka — mistake-proofing device or feature that prevents an error or detects it immediately so defects cannot pass downstream
  2. B.Heijunka — signal card or bin that authorises production or withdrawal of a fixed quantity, pulling material only when the downstream process consumes it
  3. C.Heijunka — continuous small improvements made by everyone, often run as a focused three-to-five-day event on one process
  4. D.Heijunka — levelling production volume and model mix over a period so upstream processes and suppliers see a smooth, repeatable demand

Answer + AI explanation with Pro

Free to start

Start with a free readiness check

Sign up free for the 2-minute ME readiness check and a scored result. Answers, explanations and the AI tutor on every Lean Manufacturing question come with Pro.

Take the free ME readiness check

or take a mock interview set up for this area

24,000+ questions & coding problemsSoftware & IT16,274 questionsGovernment jobs26 examsAptitudenew questions every timeAI practice interviewwith feedback65 topics to practiseMechanical1,149 questionsGATE ME9 papersEngineering Mathematics381 questions2-minute checkfreeDSA Problems1,422Civil1,005 questionsGATE CE9 papersCS Fundamentals1,209 questionsYour scores6 skillsSystem Design25Electrical / EEE1,047 questionsGATE EE9 papersRun your codeC++ · Java · PythonLow-Level Design144Electronics & Comm.975 questionsGATE EC9 papersAI help on every questionFull-Stack6,282Chemical1,005 questionsGATE CH9 papersAI whiteboardsystem designWork abroadEurope · remote · transfersESE ME1 paperGATE practice papers2019–2026ESE CE1 paperDate alertsbefore the last dateESE EE1 paperBehavioural courseHR round practiceESE ET1 paperResume optimizerProSSC JE ME1 paperApplication trackerSSC JE CE1 paperCompany-wise prepSSC JE EE1 paperRole roadmapsRRB JE1 subjectPriced in ₹UPI · cardsISRO SC1 paperGATE CS9 papersIBPS SO IT1 paperUGC NET CS1 paperSSC CGL26 papersIBPS PO26 papersRRB NTPC26 papersSSC CHSL26 papersIBPS Clerk26 papersSBI Clerk26 papersRRB Group D26 papersSSC CPO26 papersSSC GD26 papers