1. What is DMAIC?

Junior
  1. A.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  2. B.define, measure, analyse, improve and control, the roadmap for improving an existing process
  3. C.performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2
  4. D.(USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred

Answer + AI explanation with Pro

2. Which term means: "define, measure, analyse, improve and control, the roadmap for improving an existing process"?

Junior
  1. A.X-bar and R chart
  2. B.Gauge R&R
  3. C.DMAIC
  4. D.Cpk

Answer + AI explanation with Pro

3. Which statement is correct?

Junior
  1. A.DMAIC — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  2. B.DMAIC — define, measure, analyse, improve and control, the roadmap for improving an existing process
  3. C.DMAIC — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  4. D.DMAIC — measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%

Answer + AI explanation with Pro

4. What is Six sigma quality level?

Junior
  1. A.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  2. B.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  3. C.planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  4. D.3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean

Answer + AI explanation with Pro

5. Which term means: "3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean"?

Junior
  1. A.Design of experiments
  2. B.Six sigma quality level
  3. C.DMAIC
  4. D.Pp and Ppk

Answer + AI explanation with Pro

6. Which statement is correct?

Junior
  1. A.Six sigma quality level — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  2. B.Six sigma quality level — planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  3. C.Six sigma quality level — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  4. D.Six sigma quality level — (USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred

Answer + AI explanation with Pro

7. What is Cp?

Junior
  1. A.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  2. B.3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  3. C.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  4. D.(USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred

Answer + AI explanation with Pro

8. Which term means: "(USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred"?

Junior
  1. A.Six sigma quality level
  2. B.Pp and Ppk
  3. C.Western Electric rules
  4. D.Cp

Answer + AI explanation with Pro

9. Which statement is correct?

Junior
  1. A.Cp — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  2. B.Cp — (USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred
  3. C.Cp — variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  4. D.Cp — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean

Answer + AI explanation with Pro

10. What is Cpk?

Junior
  1. A.performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2
  2. B.(USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred
  3. C.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  4. D.smaller of (USL − mean)/3σ and (mean − LSL)/3σ, accounting for centring, with 1.33 the usual minimum and 1.67 asked for new processes

Answer + AI explanation with Pro

11. Which term means: "smaller of (USL − mean)/3σ and (mean − LSL)/3σ, accounting for centring, with 1.33 the usual minimum and 1.67 asked for new processes"?

Junior
  1. A.Cpk
  2. B.DMAIC
  3. C.X-bar and R chart
  4. D.Design of experiments

Answer + AI explanation with Pro

12. Which statement is correct?

Junior
  1. A.Cpk — smaller of (USL − mean)/3σ and (mean − LSL)/3σ, accounting for centring, with 1.33 the usual minimum and 1.67 asked for new processes
  2. B.Cpk — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  3. C.Cpk — define, measure, analyse, improve and control, the roadmap for improving an existing process
  4. D.Cpk — measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%

Answer + AI explanation with Pro

13. What is Pp and Ppk?

Mid
  1. A.performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2
  2. B.3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  3. C.planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  4. D.define, measure, analyse, improve and control, the roadmap for improving an existing process

Answer + AI explanation with Pro

14. Which term means: "performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2"?

Mid
  1. A.Pp and Ppk
  2. B.Western Electric rules
  3. C.Cpk
  4. D.DMAIC

Answer + AI explanation with Pro

15. Which statement is correct?

Mid
  1. A.Pp and Ppk — define, measure, analyse, improve and control, the roadmap for improving an existing process
  2. B.Pp and Ppk — (USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred
  3. C.Pp and Ppk — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  4. D.Pp and Ppk — performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2

Answer + AI explanation with Pro

16. What is X-bar and R chart?

Mid
  1. A.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  2. B.measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%
  3. C.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean
  4. D.3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean

Answer + AI explanation with Pro

17. Which term means: "variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean"?

Mid
  1. A.Six sigma quality level
  2. B.Design of experiments
  3. C.Cpk
  4. D.X-bar and R chart

Answer + AI explanation with Pro

18. Which statement is correct?

Mid
  1. A.X-bar and R chart — (USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred
  2. B.X-bar and R chart — measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%
  3. C.X-bar and R chart — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  4. D.X-bar and R chart — variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean

Answer + AI explanation with Pro

19. What is Western Electric rules?

Mid
  1. A.define, measure, analyse, improve and control, the roadmap for improving an existing process
  2. B.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  3. C.measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%
  4. D.performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2

Answer + AI explanation with Pro

20. Which term means: "out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre"?

Mid
  1. A.Western Electric rules
  2. B.Cp
  3. C.Pp and Ppk
  4. D.Cpk

Answer + AI explanation with Pro

21. Which statement is correct?

Mid
  1. A.Western Electric rules — performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2
  2. B.Western Electric rules — out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  3. C.Western Electric rules — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  4. D.Western Electric rules — (USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred

Answer + AI explanation with Pro

22. What is Gauge R&R?

Mid
  1. A.measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%
  2. B.performance indices that use the overall long-term standard deviation instead of the within-subgroup sigma estimated from R-bar/d2
  3. C.define, measure, analyse, improve and control, the roadmap for improving an existing process
  4. D.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre

Answer + AI explanation with Pro

23. Which term means: "measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%"?

Mid
  1. A.DMAIC
  2. B.Gauge R&R
  3. C.Six sigma quality level
  4. D.Cp

Answer + AI explanation with Pro

24. Which statement is correct?

Mid
  1. A.Gauge R&R — smaller of (USL − mean)/3σ and (mean − LSL)/3σ, accounting for centring, with 1.33 the usual minimum and 1.67 asked for new processes
  2. B.Gauge R&R — planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  3. C.Gauge R&R — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  4. D.Gauge R&R — measurement system study splitting variation into repeatability (equipment) and reproducibility (appraisers), acceptable below 10% of tolerance and rejected above 30%

Answer + AI explanation with Pro

25. What is Design of experiments?

Senior
  1. A.out-of-control tests such as one point beyond 3σ, two of three beyond 2σ, four of five beyond 1σ or eight in a row on one side of centre
  2. B.(USL − LSL) divided by 6σ, the potential capability of a process ignoring how well it is centred
  3. C.planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  4. D.variable control chart tracking subgroup means and ranges, with control limits at ±A2·R-bar around the grand mean

Answer + AI explanation with Pro

26. Which term means: "planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions"?

Senior
  1. A.Pp and Ppk
  2. B.Six sigma quality level
  3. C.Cp
  4. D.Design of experiments

Answer + AI explanation with Pro

27. Which statement is correct?

Senior
  1. A.Design of experiments — 3.4 defects per million opportunities, which assumes a long-term 1.5-sigma shift of the process mean
  2. B.Design of experiments — planned variation of several factors at once, using factorial or Taguchi orthogonal arrays, to quantify main effects and interactions
  3. C.Design of experiments — smaller of (USL − mean)/3σ and (mean − LSL)/3σ, accounting for centring, with 1.33 the usual minimum and 1.67 asked for new processes
  4. D.Design of experiments — define, measure, analyse, improve and control, the roadmap for improving an existing process

Answer + AI explanation with Pro

Free to start

Start with a free readiness check

Sign up free for the 2-minute ME readiness check and a scored result. Answers, explanations and the AI tutor on every Six Sigma & SPC question come with Pro.

Take the free ME readiness check

or take a mock interview set up for this area

24,000+ questions & coding problemsSoftware & IT16,274 questionsGovernment jobs26 examsAptitudenew questions every timeAI practice interviewwith feedback65 topics to practiseMechanical1,149 questionsGATE ME9 papersEngineering Mathematics381 questions2-minute checkfreeDSA Problems1,422Civil1,005 questionsGATE CE9 papersCS Fundamentals1,209 questionsYour scores6 skillsSystem Design25Electrical / EEE1,047 questionsGATE EE9 papersRun your codeC++ · Java · PythonLow-Level Design144Electronics & Comm.975 questionsGATE EC9 papersAI help on every questionFull-Stack6,282Chemical1,005 questionsGATE CH9 papersAI whiteboardsystem designWork abroadEurope · remote · transfersESE ME1 paperGATE practice papers2019–2026ESE CE1 paperDate alertsbefore the last dateESE EE1 paperBehavioural courseHR round practiceESE ET1 paperResume optimizerProSSC JE ME1 paperApplication trackerSSC JE CE1 paperCompany-wise prepSSC JE EE1 paperRole roadmapsRRB JE1 subjectPriced in ₹UPI · cardsISRO SC1 paperGATE CS9 papersIBPS SO IT1 paperUGC NET CS1 paperSSC CGL26 papersIBPS PO26 papersRRB NTPC26 papersSSC CHSL26 papersIBPS Clerk26 papersSBI Clerk26 papersRRB Group D26 papersSSC CPO26 papersSSC GD26 papers